This timber supply analysis was used to inform the 2014 Timber Supply Analysis of TFL 47 conducted by the Chief Forester's Office. It shows that Ecora estimated the timber harvesting land base in TFL 47 on Quadra Island to be 7100 hectares (chart on page 6).
Of this 7100 hectares we estimate 5500 hectares are in the SMZ 19 portion of TFL 47.