-
Harvest Billing Reports by Tenure Agreement (Quadra Island)
(Results shown here are for the latest full year for which the tenure-holder reported harvesting through the Ministry of Forests' Harvest Billing System)
Alex Hartford (W0025)
2018
4064 cubic metres reported harvested
Stumpage assessed: $11,292.49
Average stumpage: $2.78 per cubic metre
Benner Forestry Forestry (W1897)
2018
4559 cubic metres reported harvested
Stumpage assessed: $11,534.35
Average stumpage: $2.53 per cubic metre
Cape Mudge Forestry (W1969)
2019
10,247 cubic metres reported harvested
Stumpage assessed: $35,529.83
Average stumpage: $3.47 per cubic metre
Discovery Forestry (W1610)
2018
4092 cubic metres reported harvested
Stumpage assessed: $11,783.43
Average stumpage: $2.89 per cubic metre
Forever Wood Ltd. (W0042)
2018
4867 cubic metres reported harvested
Stumpage assessed: $12,630.03
Average stumpage: $2.60 per cubic metre
Rockview Resources (W1611)
2018
2634 cubic metres reported harvested
Stumpage assessed: $7,437.83
Average stumpage: $2.829 per cubic metre
Snarpen Contracting (W1899)
2018
522 cubic metres reported harvested
Stumpage assessed: $839.64
Average stumpage: $1.61 per cubic metre
Younger Brothers Holdings (W2032)
2019
2484 cubic metres reported harvested
Stumpage assessed: $8319.41
Average stumpage: $3.35 per cubic metre